East Bay Raceway Park - dead clay oval and grandstand after 2024 closure (Burts Rd, Gibsonton/Riverview line)
View only, likely present. Stable, untended.
Forty-eight years of dirt-track racing in the shadow of the phosphate mountains, sold to the phosphate miner next door; the empty oval now waits to become, in the owner’s words, another mountain of dirt left over from mining phosphate.
This ground has been surveyed from the air since the 1970s. Figure 1 sets the earliest flight beside the latest; figure 2 runs through the flights between them.
1970s2026
Fig. 1. Then and now: 1970s and 2026, the same 600 m window. The yellow cross marks the site. Drag the divider, or use the slider.Aerial imagery: Southwest Florida Water Management District (SWFWMD), 1970s and 2026. Florida public record.
Getting to it
View only. Visible from public ground; do not enter.
Burts Road (OSM way 10980996, highway=residential, no access tag; public road per OSM, not field-verified) at about 27.88637,-82.38821, looking south about 150 m across an open field to the north turns of the oval. The grandstand at about 27.8843,-82.3890 is about 230 m from the road, and a tree clump just south of the road near -82.3890 may block the direct line to it. The task’s point 27.88638,-82.38726 is at the east end of Burts Rd, where a dense tree belt (x about 530–660 px in the tile) blocks the view, so it is the worse spot. The service drives running south off Burts Rd at -82.38921, -82.38941 and -82.38958 (OSM ways 744592565/6/7) are tagged access=private: do not enter.
Adjacent active phosphogypsum stack operations and heavy equipment.
Possible demolition/earthmoving activity.
Deteriorating grandstand structures.
Snakes in overgrown infield.
Nothing here has been checked on the ground by a person unless the record says so. Obey posted signs, stay on public land unless you hold permission, and never climb onto or into anything.
Through the decades
Figure 2 shows 9 survey flights over the same 600 m window, the 1970s to 2026. A year is when the survey was flown, not an exact date.
Fig. 2. The same 600 m window on 9 aerial surveys, 1970s to 2026.Aerial imagery: Southwest Florida Water Management District (SWFWMD), 1970s-2026. Florida public record.
From above
Figures 3 to 4 are single aerials at stated ground widths, for finding the site among its neighbours.
Fig. 3. SWFWMD aerial, 2026, 300 m window.Fig. 4. SWFWMD aerial, 2026, 1 km window.
Figures 3 to 4: Aerial imagery: Southwest Florida Water Management District (SWFWMD), 2026. Florida public record.